Objectives
Content
Introduction to Pumps and Valves
Pump and Valve Selection Criteria
System Integration and Optimization
Maintenance and Troubleshooting
DATE:
1ST BATCH: 10th – 13th Feb, 2026
2ND BATCH: 2nd – 5th Jun, 2026
3RD BATCH: 28th – 30th Sept, 2026
25, Queen street, Alagomeji Bus Stop, Yaba, Lagos